Road Fix Ready Patch

PRODUCT DETAILS

Colour/Form: Black / Bituminous Concrete

Packaging/Available Sizes: Available in 20 kg Bags & 140 kg Drums | Pallet Packing

Applicable Standard: As Per Morth specifications

Coverage: 30 kg mix, can cover approximately, 1 sqmt, 2cm deep pothole

Shelf Life: 12 Months from the date of manufacture when maintained in protected storage in original unopened sealed condition at 5–40°C.


Storage Conditions

Store under cover, out of direct sunlight and protect from extremes of temperature. In tropical climates the product must be stored in an airconditioned environment. Failure to comply with the recommended storage conditions may result in premature deterioration of the product or packaging.

KEY FEATURES

  • No Heating Required: Save 9 Ready Patch can be applied at ambient temperatures, eliminating the need for heating equipment.

  • Easy & Quick Application: Potholes can be filled immediately with Ready Patch, making it ideal for urgent repairs.

  • All-Weather Applications: Save 9 Ready Patch can be applied in various weather conditions, including cold and wet climates, where hot mix asphalt would not be feasible.

  • Enhanced Safety: The absence of hot materials and heavy equipment reduces the risk of accidents and injuries at the worksite.

  • Green Product: The production and application of Save 9 Ready Patch generate lower greenhouse gas emissions. The process saves energy by eliminating the need for heating.

  • Easy Storage and Handling: Save 9 Ready Patch can be stored for extended periods without losing its effectiveness. It can be stockpiled and used as needed, reducing waste.

  • Versatile Applications: Adaptable for multiple repair types, including potholes and utility cuts on various pavements. Ready Patch is also suitable for minor repairs, maintenance work, and temporary patches.

Category:

Description

Save 9 ready patch is an instant repair pre-mix and ready to use material for permanent repair of pot-holes/cracks and depression on the blacktop roads and concrete surface. It is perfectly designed to withstand the extreme temperature (0C to 60C) and heavy traffic conditions. Also due to its flexibility, it adopts perfect in nature. It is modified all weather bitumen premix consists of nominal graded aggregate, chemicals, anti stripping agents and additives. Save 9 Ready Patch is specially formulated for the immediate & permanent repair of potholes, cracks, depressions and broken areas in tarmacadam, asphalt concrete surfaces. It is ideally suited for Indian roads and is designed to withstand extreme temperatures and heavy traffic.

APPLICATION METHOD

SURFACE PREPARATION

Remove all loose gravel, dirt, oil, grease and foreign matter by jet of dry air. Ensure that the surface is structurally sound and dry. In case of new concrete road, concrete is at least 28 days old. Ambient temperature is not less than 5°C and not more than 35°C at the time of application. There is no standing water in the area to be repaired or in the area of application. Mechanically grinding the surface is acceptable only when sand blasting is not possible. Saw cut area to be repaired in geometrical shape.


MATERIAL PREPARATION

Stir Component A thoroughly for uniformity. Mix component A (Resin) & component C (Aggregate) thoroughly by using speed drill mixer with a spiral type blade at the bottom of stirrer rod till homogeneous mix is obtained. Then add component B (Hardener) slowly, ensuring complete dispersion. Mix for a minimum of 2–3 minutes.


APPLICATION OF MATERIAL

Directly pour mixed material into the cracks, finish surface with trowel if required. Allow it to dry at least two hours before opening traffic. Curing time will vary according to weather conditions.

PRECAUTIONS WHILE USING READY PATCH

  • Pothole filling should not be carried out under heavy rains or when there is a constant flow of water over the surface which has to be repaired.

  • Loose earth should not be filled in potholes before applying road patching material.

  • For large potholes (pothole site more than 0.5 sq. meter), depending on the depth of pothole, 4–5 mm stone aggregates should be used as the bottom layer to provide the base for bedrock.

Reviews

There are no reviews yet.

Be the first to review “Road Fix Ready Patch”

Your email address will not be published. Required fields are marked *